City of Calgary - Request for Proposal - 26-1639 Engineering Services for Bonnybrook Wastewater Treatment Plant Headworks Expansion
Solicitation number AB-2026-04988
Publication date
Closing date and time 2026/08/11 12:18 EDT
Description
The City is seeking engineering consulting services to evaluate municipal wastewater preliminary treatment and odour control technologies, and to develop a conceptual design for a new headworks (HW) facility at the Bonnybrook Wastewater Treatment Plant (BBWWTP) to accommodate population growth. This project anticipates the following Phases:
• Phase 1 Feasibility Study and Conceptual Design
• Phase 2 Preliminary and Detailed Design
• Phase 3 Construction Engineering Support and Post Construction Services
Unless otherwise stated in the Agreement Letter, the award under this RFP will be for Phase 1 of the Requirements, subject to approval by The City after each Phase.
Contract duration
The estimated contract period will be 45 month(s), with a proposed start date of 2026/09/08.
Trade agreements
-
Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
Contact information
Contracting organization
- Organization
-
City of Calgary
- Address
-
677-25 Ave SECalgary, CA-AB, T2G 4K8CA
- Contracting authority
- Abdul Samad
- Address
-
677-25 Ave SECalgary, Alberta, T2G 4K8Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.