Municipal District of Bonnyville No. 87 - Request for Proposal - Engineering Consulting Services
Solicitation number AB-2026-05033
Publication date
Closing date and time 2026/07/31 10:00 EDT
Description
The Municipal District of Bonnyville No. 87 (MD) Protective Services Department wishes to enter into a three (3)-year Standing Offer Agreement (SOA) with a qualified consulting firm and/or consultant, including any subcontracted services. The purpose of the SOA is to supplement in-house resources and provide direct access to industry expertise for the review, analysis, and preparation of recommendations. Services will include supporting quality customer service, effective project delivery, consistent and reliable engineering services, refined budgeting, and the preparation of supporting documentation and drawings.
The successful consultant will be expected to become familiar with the MD’s policies and procedures, organizational structure, and operating and software systems. In addition, the consultant shall become familiar with the MD’s master plans and strategic initiatives.
The consultant shall be available on an on-call basis to address any engineering consulting requirements the MD may have throughout the term of the SOA.
Mr. Gandolfi will act as the Project Sponsor, providing strategic oversight and approvals. The Proponent’s Project Manager shall be responsible for day-to-day management, coordination, and reporting.
The successful Proponent shall provide professional engineering services, including but not limited to:
• Planning, feasibility studies, and options analysis
• Conceptual, preliminary, and detailed design
• Preparation of technical reports, drawings, and specifications
• Cost estimating and scheduling support
• Permitting and regulatory approval support
• Preparation of tender documents
• Construction contract administration
• Site services and inspections
• Deficiency management and project closeout
Services may span multiple disciplines depending on project requirements.
The Proponent shall provide comprehensive MD’s representative project management services, including all phases of the project lifecycle:
• Project initiation and definition
• Scope, schedule, and budget development
• Risk, change, and issue management
• Cost control, forecasting, and reporting
• Quality assurance and quality control
• Stakeholder coordination
• Construction oversight
• Substantial completion and closeout
Typical projects, studies, design and engineering for approved projects that may occur, but are not limited to:
Roadways
• Preliminary Engineering
• Utility Investigation – Utility Crossing Agreements and Relocations
• Environmental Assessment and Regulatory Permitting
• Geotechnical Investigation
• Drainage Analysis
• Right-of-Way Acquisition including Backslope Agreements and Borrow Agreements
• Assessment of Existing Asphalt Pavement Structures
• Pavement Design
• Detailed Design including Drawings and Cost Estimates
• Tender Preparation and Administration
• Construction Supervision and Contract Administration
• Material Testing Services
• Post-Construction Engineering Services
Surveying
• Preliminary Surveys
• Drainage Surveys
• Topographic Surveys
• Construction Surveys
• Legal Surveys
Development Related
• Developer-supplied Engineer Drawing Review or Developer-supplied Study Review
• Standard Development Updates
• Traffic Impact Assessments
Transportation Systems
• Functional Planning Studies and Concept/Preliminary Design for Estimating/Budgeting
• Modelling (Traffic, Intersection Design, etc.)
• Detailed Design
• Tender/Construction Supervision and Contract Administration
Parks, Trails, Campsites, and Docking Stations
• Concept/Preliminary Design
• Feasibility Studies
• Estimating/Budgeting
• Detailed Design
• Tender/Construction Supervision and Contract Administration
• RFP Preparation and Review/Evaluation
Utilities Systems (Water Supply, Pumping Stations, Retention Ponds, Lagoons, Sewer Systems)
• Feasibility Studies
• Concept/Preliminary Design
• Estimating/Budgeting Modelling
• Detailed/Construction Design
• Tender/Construction Supervision and Contract Administration
Water Management/Storm Water Management
• Feasibility Studies
• Concept/Preliminary Design
• Estimating/Budgeting Modelling
• Detailed/Construction Design
• Tender/Construction Supervision and Contract Administration
Miscellaneous Studies/Projects
• Site Investigations
• Geotechnical Studies/Designs
• Minor Structural Design
• Document Development
• Drafting
• Database and Collection of Information
• RFP Preparation and Review/Evaluation
Other scope of work that may be assigned by the MD as required, are building construction, capital planning and budgeting, and life cycle analysis planning and management.
Contract duration
The estimated contract period will be 41 month(s), with a proposed start date of 2026/08/03.
Trade agreements
-
No trade agreements are applicable to this solicitation process
Contact information
Contracting organization
- Organization
-
Municipal District of Bonnyville No. 87
- Address
-
4905 - 50 Avenue, Bag 1010Bonnyville, CA-AB, T9N 2J7CA
- Contracting authority
- Amber Ozaruk
- Address
-
4905 - 50 Avenue, Bag 1010Bonnyville, Alberta, T9N 2J7Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.