11208 Construction Management - Renovation - YLW Combined Operations Building
Solicitation number BC157428
Publication date
Closing date and time 2023/03/14 17:00 EDT
Last amendment date
Description
Pre construction management services are required to support the design, engineering, and construction of the new, and renovation of the existing Combined Operations Building (COB) campus at Kelowna International Airport (YLW). The scope includes pre-con support for the design, renovate, and build a facility in a phased manner. The proposed development will encompass the existing facility and incorporate, the Cargo One facility and relocation of the NPS-V facility as identified in the Airport Master Plan 2045. The new facility will be designed to optimize efficiencies in both Aircraft Rescue and Fire Fighting (ARFF) and operational responses. The Airport Operations Centre (AOC) will be strategically located to maximize visibility to airside surfaces which will assist in providing efficient and timely responses for operational purposes. The proposed footprint is currently occupied by Cargo One. The lease of this building is set to terminate in the first quarter of 2024, which would allow the demolition and construction of the new facility immediately at that time. It may be possible to advance some of the construction in enabling works packages.
Contract duration
Refer to the description above for full details.
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
City of Kelowna
- Contracting authority
- Anna Levay
- Email
- purchasing@kelowna.ca
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.