Trades Packages for UFV Dining Hall Renovation
Solicitation number BC172517
Publication date
Closing date and time 2023/07/24 17:00 EDT
Description
The University of the Fraser Valley (UFV) is renovating the existing main dining facility located on the ground floor of Building B on the
Abbotsford campus. The expansion will consist of adding a second floor, increasing the seating capacity from 121 to a minimum 250 seats,
expanding the existing kitchen, storage and serving areas, (Back of house – BOH) increasing the total floor area to approximately 1232m2.
The expansion is needed to support the 200 students in existing student housing, commuter students, faculty, staff and students in the new
approved 400 bed student housing.
Scopes included in the prequalification are as follows:
024000 - DEMOLITION
028000 - ABATEMENT
030000 - CONCRETE WORKS (FORMWORK/REBAR/SUPPLY)
033500 - POLISHED CONCRETE / FLOOR LEVELING
061800 - MASS TIMBER
072400 - EFIS – REPAIR AND PATCHING
076400 - METAL CLADDING
064000/081400/123660 - MILLWORK / WOOD DOORS & FRAMES / STONE COUNTERTOPS
084000 - GLAZING / CURTAIN WALL
092200/092526/092900/095123/095426/095440 - WALLS & CEILINGS
220000/230000 - PLUMBING, HVAC
260000 - ELECTRICAL, COMMUNICATIONS
310000 - CIVIL/EARTHWORKS
329000 - LANDSCAPING
055000 - STRUCTURAL STEEL
120000 - KITCHEN EQUIPMENT
092000 - DRYWALL / CEILING
Turner Construction is the Construction Manager for this Project . All questions and documents regarding prequalification are available to download Turner Construction.
To gain access to the Prequalification Documents, please contact Kieran Healy, Project Manager via email at khealy@tcco.com, and he will respond with access instructions.
Abbotsford campus. The expansion will consist of adding a second floor, increasing the seating capacity from 121 to a minimum 250 seats,
expanding the existing kitchen, storage and serving areas, (Back of house – BOH) increasing the total floor area to approximately 1232m2.
The expansion is needed to support the 200 students in existing student housing, commuter students, faculty, staff and students in the new
approved 400 bed student housing.
Scopes included in the prequalification are as follows:
024000 - DEMOLITION
028000 - ABATEMENT
030000 - CONCRETE WORKS (FORMWORK/REBAR/SUPPLY)
033500 - POLISHED CONCRETE / FLOOR LEVELING
061800 - MASS TIMBER
072400 - EFIS – REPAIR AND PATCHING
076400 - METAL CLADDING
064000/081400/123660 - MILLWORK / WOOD DOORS & FRAMES / STONE COUNTERTOPS
084000 - GLAZING / CURTAIN WALL
092200/092526/092900/095123/095426/095440 - WALLS & CEILINGS
220000/230000 - PLUMBING, HVAC
260000 - ELECTRICAL, COMMUNICATIONS
310000 - CIVIL/EARTHWORKS
329000 - LANDSCAPING
055000 - STRUCTURAL STEEL
120000 - KITCHEN EQUIPMENT
092000 - DRYWALL / CEILING
Turner Construction is the Construction Manager for this Project . All questions and documents regarding prequalification are available to download Turner Construction.
To gain access to the Prequalification Documents, please contact Kieran Healy, Project Manager via email at khealy@tcco.com, and he will respond with access instructions.
Contract duration
Refer to the description above for full details.
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
University of the Fraser Valley
- Address
-
33844 King RoadAbbotsford, British Columbia, V2S 7M8Canada
- Contracting authority
- Tammy Upton
- Email
- tammy.upton@ufv.ca
- Address
-
33844 King RoadAbbotsford, British Columbia,Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.