North Peace Fall Fair – Feasibility Study, RFP 32-2023
Solicitation number BC176843
Publication date
Closing date and time 2023/09/01 13:00 EDT
Description
The Peace River Regional District (Regional District) is requesting proposals from qualified proponents to submit proposals for North Peace Fall Fair – Feasibility Study.
The North Peace Fall Fair is owned by the Peace River Regional District, and operated by agreement by the North Peace Fall Fair Society. Over a number of years, the Society has grown the facilities on the grounds to include a number of buildings and other structures to accommodate the fair, and to commemorate the agricultural history of the North Peace. In order to ensure continued safe use of these buildings and to ensure the grounds are being used to the greatest extent, a feasibility study is required. The feasibility study would include: conceptual design and cost estimate to upgrade the Adeline Kelly Hall to a public occupancy building, a needs assessment that examines the existing buildings and structures and identifies opportunities for increased usage, options for operating models, new or upgraded buildings, and operating costs.
The study is to be completed, including final report submission and findings presentation to the Board of the Peace River Regional District on or before December 8, 2023.
The North Peace Fall Fair is owned by the Peace River Regional District, and operated by agreement by the North Peace Fall Fair Society. Over a number of years, the Society has grown the facilities on the grounds to include a number of buildings and other structures to accommodate the fair, and to commemorate the agricultural history of the North Peace. In order to ensure continued safe use of these buildings and to ensure the grounds are being used to the greatest extent, a feasibility study is required. The feasibility study would include: conceptual design and cost estimate to upgrade the Adeline Kelly Hall to a public occupancy building, a needs assessment that examines the existing buildings and structures and identifies opportunities for increased usage, options for operating models, new or upgraded buildings, and operating costs.
The study is to be completed, including final report submission and findings presentation to the Board of the Peace River Regional District on or before December 8, 2023.
Contract duration
The estimated contract period will be 4 month(s).
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
Peace River Regional District
- Address
-
1981 Alaska AveDawson Creek, British Columbia, V1G 1P5Canada
- Contracting authority
- Leanne Milliken
- Email
- procurement@prrd.bc.ca
- Address
-
1981 Alaska AveDawson Creek, British Columbia,Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.