Queen's Park Elementary - HVAC Upgrade Phase 2
Solicitation number BC190676
Publication date
Closing date and time 2024/04/03 17:00 EDT
Last amendment date
Description
• Replacement of the remaining (9) classroom rooftop units with packaged heat pumps w/ natural gas backup
heating
• Replacement of (2) admin area rooftop units with packaged heat pump(s) w/ natural gas backup heating
• Replacement or addition of (3) exhaust systems
• Tie-in of new room multi-function sensors to provide carbon dioxide (CO2) and occupancy sensing, in addition to room temperature sensing only
• Integration of all new HVAC systems with the school’s DDC system
heating
• Replacement of (2) admin area rooftop units with packaged heat pump(s) w/ natural gas backup heating
• Replacement or addition of (3) exhaust systems
• Tie-in of new room multi-function sensors to provide carbon dioxide (CO2) and occupancy sensing, in addition to room temperature sensing only
• Integration of all new HVAC systems with the school’s DDC system
Contract duration
Refer to the description above for full details.
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
School District 67 Okanagan Skaha
- Contracting authority
- Crystal Ozaraci
- Email
- cozaraci@sd67.bc.ca
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.