SD45 Ecole Pauline Johnson HVAC Upgrade Project Phase 1
Solicitation number BC229142
Publication date
Closing date and time 2026/06/02 17:00 EDT
Description
Invitation to Tenbder for SD45 Ecole Pauline Johnson HVAC Upgrade Project Phase 1 to provide new, complete, operational, and tested mechanical systems for heating,
ventilation, air conditioning, and controls systems as described herein, indicated on the
drawings and in conformance with applicable codes and standards. Provide all labour, materials, and products as specified as required to accomplish this work.
Mandatory Site Orientation (Tender Walk through) on Friday, May 15 @11AM
ventilation, air conditioning, and controls systems as described herein, indicated on the
drawings and in conformance with applicable codes and standards. Provide all labour, materials, and products as specified as required to accomplish this work.
Mandatory Site Orientation (Tender Walk through) on Friday, May 15 @11AM
Contract duration
Refer to the description above for full details.
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
School District 45 West Vancouver
- Address
-
1075 21st StWest Vancouver, British Columbia, V7V 0B4Canada
- Contracting authority
- MARK SON
- Email
- mson@wvschools.ca
- Address
-
1075 21st StWest Vancouver, British Columbia, V7V 0B4Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.