Pritchard WWTP Upgrade
Solicitation number BC379-801-001
Publication date
Closing date and time 2026/05/01 17:00 EDT
Last amendment date
Description
Addendum No.5 - April 29, 2026
Addendum No.4 - April 27, 2026
Addendum No.3 - April 20, 2026
Addendum No.2 - April 16, 2026 - Closing Date Change
Addendum No.1 - April 15, 2026
The Thompson-Nicola Regional District (Owner) invites Proposals, through this Negotiated Request for Proposal (NRFP), from Proponents for the Pritchard Wastewater Treatment Plant Upgrade project.
The Proponent is to include the following work that represents a base Proposal:Cleaning and refinishing primary settling tank #1 and #2, ADT1 and ANT2/AET2 Cleaning and filling with light weight concrete in secondary tank and clarifier tank Removal and disposal/relocation of existing equipment and interior framing Installation of Owner supplied equipment from Eco Fluid Construct ANT1/AET1/MBT1/MBT2 concrete tank Equalization pump chamber Framing of ANT2/AET2 and bathroom area c/w bathroom accessories Process, air and yard piping Electrical works c/w new MCC, transformer, panel, PLC and automatic transfer switch c/w power and control wiring In addition to responding to the base Proposal, the Proponent is invited to propose any innovations that the Proponent believes will reduce the cost of the Project, improve the constructability of the Project, or improve the performance of the facility. The intent is for the Proponent to use their knowledge of construction practices to improve the overall Project by shortening the construction time frame and reducing the overall Project cost.
Addendum No.4 - April 27, 2026
Addendum No.3 - April 20, 2026
Addendum No.2 - April 16, 2026 - Closing Date Change
Addendum No.1 - April 15, 2026
The Thompson-Nicola Regional District (Owner) invites Proposals, through this Negotiated Request for Proposal (NRFP), from Proponents for the Pritchard Wastewater Treatment Plant Upgrade project.
The Proponent is to include the following work that represents a base Proposal:Cleaning and refinishing primary settling tank #1 and #2, ADT1 and ANT2/AET2 Cleaning and filling with light weight concrete in secondary tank and clarifier tank Removal and disposal/relocation of existing equipment and interior framing Installation of Owner supplied equipment from Eco Fluid Construct ANT1/AET1/MBT1/MBT2 concrete tank Equalization pump chamber Framing of ANT2/AET2 and bathroom area c/w bathroom accessories Process, air and yard piping Electrical works c/w new MCC, transformer, panel, PLC and automatic transfer switch c/w power and control wiring In addition to responding to the base Proposal, the Proponent is invited to propose any innovations that the Proponent believes will reduce the cost of the Project, improve the constructability of the Project, or improve the performance of the facility. The intent is for the Proponent to use their knowledge of construction practices to improve the overall Project by shortening the construction time frame and reducing the overall Project cost.
Contract duration
Refer to the description above for full details.
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
Thompson Nicola Regional District
- Email
- semerson@true.bc.ca
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.