Blower Room Ventilation Upgrades
Solicitation number BCR24-912
Publication date
Closing date and time 2024/05/10 17:00 EDT
Description
SUMMARY:
Through this Request for Proposals (“RFP”), the Regional District of Central Okanagan (the “District”) invites Proposals from suitability qualified and experienced companies, interested in performing work to complete the supply and installation of 2 exhaust fans along with associated works, in the Operations Building at the Regional District’s Westside Regional Wastewater Treatment Plant (WRWTP).
Full details of the Work required is provided in Division 01 – General Requirements, plus Exhibit A – Contract Drawings of this RFP. A summary of the Work is as follows:
Location: The Place of the Work is the Operations Building at the Westside Regional Wastewater Treatment Plant (WRWTP), 4261 Gellatly Rd S, West Kelowna, BC, as shown on the Drawings.
Maximum Budget: The District is not stating a maximum budget for this Work.
Contract Time: The following are key milestone dates required for the Work:
• The Work may commence anytime after: May 24, 2024
• The Work must be Ready-For-Takeover no later than: August 30, 2024.
Form of Contract: The Form of Contract to be executed between the District and the Contractor for the Work will be the CCDC2 – 2020 Stipulated Price Contract, as modified by Supplementary Conditions.
Further details are provided in the RFP.
Through this Request for Proposals (“RFP”), the Regional District of Central Okanagan (the “District”) invites Proposals from suitability qualified and experienced companies, interested in performing work to complete the supply and installation of 2 exhaust fans along with associated works, in the Operations Building at the Regional District’s Westside Regional Wastewater Treatment Plant (WRWTP).
Full details of the Work required is provided in Division 01 – General Requirements, plus Exhibit A – Contract Drawings of this RFP. A summary of the Work is as follows:
Location: The Place of the Work is the Operations Building at the Westside Regional Wastewater Treatment Plant (WRWTP), 4261 Gellatly Rd S, West Kelowna, BC, as shown on the Drawings.
Maximum Budget: The District is not stating a maximum budget for this Work.
Contract Time: The following are key milestone dates required for the Work:
• The Work may commence anytime after: May 24, 2024
• The Work must be Ready-For-Takeover no later than: August 30, 2024.
Form of Contract: The Form of Contract to be executed between the District and the Contractor for the Work will be the CCDC2 – 2020 Stipulated Price Contract, as modified by Supplementary Conditions.
Further details are provided in the RFP.
Contract duration
The estimated contract period will be 9 month(s).
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
Regional District of Central Okanagan
- Address
-
4261 Gellatly Rd SWest Kelowna, British Columbia, V4T 2K3Canada
- Contracting authority
- KAL KAHLON
- Email
- purchasing@rdco.com
- Address
-
4261 Gellatly Rd SWest Kelowna, British Columbia,Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.