HARRIS RD COMPLETE STREET - FEASIBILITY STUDY
Solicitation number BCRFP_2024-14PM
Publication date
Closing date and time 2024/08/06 17:00 EDT
Last amendment date
Description
The City of Pitt Meadows (the ‘City’) is requesting Proposals from qualified firms or individuals interested in completing a feasibility study for the Harris Rd Complete Street, including preliminary design concepts, capital and lifecycle cost, data collection and review of existing conditions, topographic survey, consideration of impacts and mitigation options, public engagement and feedback, refinement of concepts, presentation to the City’s Active Transportation Advisory Committee (ATAC) and Council, and finalization of a report encompassing all the applicable information. This study will be used to assess the suitability and practicality of a Complete Street Corridor through the main arterial through the City and possibly to aid future grant applications for detailed design and implementation of the works.
Contract duration
Refer to the description above for full details.
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
City of Pitt Meadows
- Contracting authority
- Christi Manson
- Email
- cmanson@pittmeadows.ca
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.