New Orchard Twin Bridge
Solicitation number NCC-DC-040796-RFP
Publication date
Closing date and time 2026/07/07 14:00 EDT
Last amendment date
Description
The NCC is seeking qualified proponent for the rehabilitation of the bridges is required to extend their lives by at least 30 years. Scope of work includes
but is not limited to:
1. Partial depth concrete removals and repairs on abutments, wing walls, bearing seats, soffits, fascia, deck, and deck ends
2. Remove and replace concrete curbs, sidewalks, and curtain walls
3. Remove existing railings and install new crash tested railings
4. Replace waterproofing system and asphalt pavements
5. Replace bearings
6. Replace approach slabs
7. Repair flagstone slope protection
Contract duration
The estimated contract period will be 12 month(s), with a proposed start date of 2026/07/27.
Trade agreements
-
Please refer to tender description or tender documents
Reason for limited tendering
A contracting officer can use limited tendering for specific reasons outlined in the applicable trade agreements. The reason for this contract is described below:
-
None
Businesses interested in partnering for this tender opportunity:
Note: Information may not be available in both English and French. This is because the Official Languages Act does not apply.
Contact information
Contracting organization
- Organization
-
National Capital Commission (NCC)
- Address
-
40 Elgin
Ottawa, Ontario, K1P 1C7Canada
- Contracting authority
- Guy Alex Cubahiro
- Phone
- 000000-0000
- Email
- guyalex.cubahiro@ncc-ccn.ca
- Address
-
342 - 40 Elgin Street
Ottawa, Ontario, K1P1C7Canada