Turnkey Solutions for a Sputtering System and Evaporation System
Solicitation number 40151-4A,6A-RFP
Publication date
Closing date and time 2026/04/17 15:00 EDT
Last amendment date
Description
The proposed turnkey solutions must fit in an allocated floor space of 15.4 m3 while allowing for a minimum clearance between both instruments of 600 mm. The proposed system must not include oil pumps.
Compatibility with an existing chilled water loop is a benefit. At most, the University can allocate 6.9L/minute for the cooling of both instruments. The supply temperature of the water loop is 14.6°C and the minimum differential pressure is 15.5 psi. Further details regarding the existing chilled water loop from a recent report in December, 2025, is as follows:
3rd Floor Chilled Loop:
Corrosion inhibitor levels are good at 88 ppm PTSA. pH and conductivity are good. Site inspection of the mechanical room did not reveal any water loss issues. Replenished CL2612 chemical supply tank. Filters are in good condition. System water appears clean and clear at this time.
Water Quality:
pH (Control Range: 8.0-10.5): 7.33
Conductivity (uS/cm): 325
Inhibitor:
PTSA (ppb – Control Range: 80-120): 88
Mandatory Requirements:
1. Sputtering System
1.1 Must include all necessary vacuum pumps. Oil pumps are not permitted.
1.2 Must include safety alert, emergency stop and interlock system.
1.3 Must include a wide range pressure sensor, capable of going down to < 9E-7 Torr.
1.4 Must include 4 sputter sources, 2 DC and 2 RF. Both RF sputter sources must be capable of operating simultaneously. Similarly, both DC sputter sources must be capable of operating simultaneously.
1.5 Must include a minimum 1.0 kW pulsed DC power supply for sputtering in DC or in pulsed DC modes.
1.6 Must include a high impulse power magnetron sputtering unit with a minimum average power of 1 kW; capable of operating to at least 10 kHz with a pulse duration selectable in at least the range from 3 to 10 microseconds; and include an oscilloscope for monitoring.
1.7 Must include an RF power supply with an automatic impedance matching network for sputtering. The proposed power supply must operate at a minimum of 600 W.
1.8 Must include a switch to enable the power supply to be shared between 2 sputtering targets.
1.9 Must include a plasma source with an RF power generator capable of a minimum of 1000 W as well as automatic impedance matching. The plasma source must also include stainless steel gas lines, gas control with 3 mass flow controllers and sufficient spare filaments with mounting jig for installation, commissioning and training.
1.10 Must include downstream gas control for reactive sputtering (Ar + 2 reactive gases) and integration with all applicable operating software.
1.11 Must include calibration Quartz Crystal Microbalance (QCM) deposition sensor, or an alternative that is demonstrated to be equivalent or superior and accepted by the University, for measuring the thickness of the deposited layer while the sample is in the chamber.
1.12 Must include a substrate stage assembly capable of accomodating one substrate of diameter up to 200 mm (8 inch), as well as smaller diameter substrates and pieces. The stage assembly must be capable of rotating at a rate adjustable between 10 to 30 RPM; include linear translation for substrate motion; include backside quartz lamp substrate heating, or an alternative heating method that is demonstrated to be equivalent or superior and accepted by the University, to at least 800oC at the substrate heater with non-contact feedback PID control; and provide RF substrate bias using 100 W RF source with matching network.
1.13 Must include 4 source shutters.
1.14 Must be able to accommodate a process control ellipsometer used for in situ film characterisation.
1.15 Must be able to accommodate a load lock, including pumps.
1.16 Must include chamber inner wall shield/cover plates.
1.17 Proposed solution must provide sputtering up capabilities.
2. Evaporation System
2.1 Must include all necessary vacuum pumps. Oil pumps are not permitted.
2.2 Must include safety alert, emergency stop and interlock system.
2.3 Must include a wide range pressure sensor, capable of going down to < 9E-7 Torr.
2.4 Must include source isolation and chamber debris shields (mechanical shielding to minimize the risk of contamination).
2.5 Must include two thermal evaporation sources, each with a scalable output voltage without the need to change cabling.
2.6 Must include power controllers, deposition controllers and monitoring Quartz Crystal Microbalance (QCM) sensors to enable simultaneous thermal co-deposition from two sources.
2.7 Must include a material database that includes densities, Z-factors and process recipes.
2.8 Must include a substrate stage assembly capable of accomodating one substrate of diameter up to 200 mm (8 inch), as well as smaller diameter substrates and pieces. The substrate stage assembly must be capable of rotating at a rate adjustable between 10 to 30 RPM, and include backside quartz lamp substrate heating to at least 500 oC with non-contact feedback PID control.
2.9 Must include a substrate shutter.
2.10 Must be able to be upgraded in the future to four (4) thermal sources with co-deposition capabilities. Pricing for this option should be included in Appendix C, under options.
2.11 Must include chamber inner wall shield/cover plates.
3. Accessories
3.1 The solution must include an independent computer for each of the turnkey solutions capable of running all required software. The solution must also include all necessary peripherals (monitor, keyboard, mouse, etc). Both desktop computers and laptops are acceptable, however it must run on Windows 11 Enterprise or newer.
3.2 Must include an independent software package for each of the turnkey solutions, preferably with similar GUIs, that can control each of the the Sputtering System and Evaporator, storing and implementing recipes, automatically logging tool status and run data, controlling all system parameters and managing all safety features.
3.3 If any aspect of the proposed turnkey solutions cannot connect to the existing chilled water loop (maximum allowance of 6.9L/minute for both turn-key solutions), a chiller(s) must be included.
3.4 All vacuum pumps within the proposed turnkey solutions must be factory/pre-installation tested to verify full functionality, including minimum vacuum levels that are achievable.
4. Other Requirements
4.1 Both instruments must fit within a combined allocated floor space of 2000mm (W) x 2100mm (D) x 2350mm (H). Of note, there must also be acceptable clearance between each instrument to allow for users to maneuver around, and perform maintenance on, each instrument without the need for moving either.
Chiller(s), pump(s) and cabinet(s) will be stored in a utility closet roughly six (6) feet away from the designated floor space for the instruments and are not to count towards the limited floor space mentioned above. In order to navigate from the instruments to the utility closet, cables provided must be a minimum of twelve (12) feet in length.
4.2 Must include on-site installation by a qualified engineer.
4.3 Must include on-site training at the University of Ottawa by a qualified engineer for a minimum of four (4) users. The training must be for a minimum of two (2) business days in length (eight (8) hours per day).
4.4 Must include a minimum of one (1) year of warranty on parts and labour.
4.5 Must include perpetual software maintenance updates for as long as the software is supported and for all software included in the proposed turnkey solutions.
4.6 Proposal must include a complete site preparation guide/checklist outlining the lab preparation requirements and facilities needed for the installation and operation of the entire turnkey solutions (main tools and auxiliary components).
4.7 The proposal must include both turnkey solutions as described in this Request for Proposals (RFP) and must include all required equipment and accessories necessary to meet all Mandatory Requirements. The University will not accept proposals for only a portion of the Deliverables described in this RFP.
4.8 CSA certification or equivalent is required, as per the Electrical Safety Authority:
https://esasafe.com/electrical-products/recognized-certification-marks/.
If any electrical components do not arrive with an acceptable certification marking, the University must be allowed to open/modify the instrument as required in order to have it CSA Certified. Said inspection/modification, if required, must not void any warranty.
4.9 All targets required for the installation and commissioning of both turnkey solutions must be included in the proposal.
4.10 The proposal must be for two (2) independent systems that are not connected to each other: One (1) Sputtering System and one (1) Evaporation System.
Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.
Contract duration
The estimated contract period will be 0 month(s), with a proposed start date of 2027/03/01.
Trade agreements
-
Canadian Free Trade Agreement (CFTA)
-
Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
University of Ottawa
- Address
-
550 Cumberland StreetOttawa, Ontario, K1N 6N5Canada
- Contracting authority
- Owen Bouley
- Phone
- 613-562-5800 x3966
- Email
- obouley@uottawa.ca
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.