Progressive Design Build - NEWPCC Upgrade: Nutrient Removal Facilities
Solicitation number 925-2024B
Publication date
Closing date and time 2026/07/17 13:00 EDT
Description
The Project will replace the secondary treatment system of the NEWPCC to
accommodate future wastewater flows and loadings to the plant and to
provide enhanced treatment capabilities to address regulatory requirements,
including nutrient removal to meet 1 mg/L total phosphorus and 15 mg/L total
nitrogen and a variable ammonia load in the final effluent. The Project scope
includes:
• installation of an intermediate pumping station;
• installation of a biological nutrient removal facility, including blowers;
• installation of a secondary clarification facility, including sludge pumping;
• installation of a fermentation and sludge thickening facility;
• installation of a phosphorus recovery facility; and
• associated works, such as yard work, internal piping galleries, external
wastewater/stormwater piping and water distribution, roads, landscaping, fire
protection, etc.
The Work is to be performed while minimizing impact on the operation of the
existing NEWPCC facility and will be interfacing with other major upgrades
underway at NEWPCC.
accommodate future wastewater flows and loadings to the plant and to
provide enhanced treatment capabilities to address regulatory requirements,
including nutrient removal to meet 1 mg/L total phosphorus and 15 mg/L total
nitrogen and a variable ammonia load in the final effluent. The Project scope
includes:
• installation of an intermediate pumping station;
• installation of a biological nutrient removal facility, including blowers;
• installation of a secondary clarification facility, including sludge pumping;
• installation of a fermentation and sludge thickening facility;
• installation of a phosphorus recovery facility; and
• associated works, such as yard work, internal piping galleries, external
wastewater/stormwater piping and water distribution, roads, landscaping, fire
protection, etc.
The Work is to be performed while minimizing impact on the operation of the
existing NEWPCC facility and will be interfacing with other major upgrades
underway at NEWPCC.
Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.
Contract duration
The estimated contract period will be 0 month(s), with a proposed start date of 2033/06/01.
Trade agreements
-
Canadian Free Trade Agreement (CFTA)
-
Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
The City of Winnipeg
- Address
-
185 King StreetWinnipeg, Manitoba, R3B 1J1Canada
- Contracting authority
- Kaylyn Crocker
- Phone
- (204) 986-7507
- Email
- KCrocker@winnipeg.ca
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.