Construction Management Services - Central Regional Correctional
Solicitation number 0675006-25
Publication date
Closing date and time 2024/03/27 12:30 EDT
Last amendment date
Description
*****QUESTIONS*******
Question # 1
Looking for clarification with regards to conflicting information between Evaluation Process and Criteria (Section 8.1. and Subsequent 8.1.1) and Experience of the Key Personnel (Section 7.2.2.3), given that the same information is to be included in Key Personnel (Section 7.2.2.4), we are of the understanding that the Evaluation Criteria takes precedence and is to be followed.
Answer
The Evaluation Criteria does not to take precedence. The instructions provided in Section 7.2.2.3 and 7.2.2.4 are to be followed.
Question #2
Item 4.1.6, request that the proposals shall be irrevocable for Thirty (30) days vs. Ninety (90) days.
Answer
Proposals shall be irrevocable for a period of 90 days as per the RFP.
Question # 3
We are requesting that the NB supplier preference and NB manufacturer preference clauses be deleted from this project and that all submissions will be evaluated the same with no adjustments to price or score based on being these.
Answer
Theses clauses have been removed
*******************************************************************************************
*****ADDENDUM # 1 *****
The closing date has been extended to March 27, 2024.
No other changes.
**************************************************************************
SCOPE
This Request for Proposals is for Construction Management Services for the Central Regional Correction Centre - Minto, New Brunswick.
CONTRACT AWARD CRITERIA
Contract will be awarded to the top ranked compliant bids which meet the requirements detailed within the specifications within the RFP.
Construction Management Services
See RFP for full details.
Question # 1
Looking for clarification with regards to conflicting information between Evaluation Process and Criteria (Section 8.1. and Subsequent 8.1.1) and Experience of the Key Personnel (Section 7.2.2.3), given that the same information is to be included in Key Personnel (Section 7.2.2.4), we are of the understanding that the Evaluation Criteria takes precedence and is to be followed.
Answer
The Evaluation Criteria does not to take precedence. The instructions provided in Section 7.2.2.3 and 7.2.2.4 are to be followed.
Question #2
Item 4.1.6, request that the proposals shall be irrevocable for Thirty (30) days vs. Ninety (90) days.
Answer
Proposals shall be irrevocable for a period of 90 days as per the RFP.
Question # 3
We are requesting that the NB supplier preference and NB manufacturer preference clauses be deleted from this project and that all submissions will be evaluated the same with no adjustments to price or score based on being these.
Answer
Theses clauses have been removed
*******************************************************************************************
*****ADDENDUM # 1 *****
The closing date has been extended to March 27, 2024.
No other changes.
**************************************************************************
SCOPE
This Request for Proposals is for Construction Management Services for the Central Regional Correction Centre - Minto, New Brunswick.
CONTRACT AWARD CRITERIA
Contract will be awarded to the top ranked compliant bids which meet the requirements detailed within the specifications within the RFP.
Construction Management Services
See RFP for full details.
Contract duration
Refer to the description above for full details.
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
Central Tendering Branch
- Address
-
Fredericton Regional CentreFredericton, New Brunswick, E3A 2S4Canada
- Contracting authority
- Tony Hay
- Phone
- 1 (506) 453-6129
- Email
- bidquestionssoumissions@snb.ca
- Address
-
1 (506) 453-6129
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.