Reconstruction of St. David Street North (Hwy#6) Fergus
Solicitation number BT-RFT#12-24
Closing date and time 2024/03/26 18:00 EDT
Last amendment date
Description
The scope of work on the above listed streets in the former Town of Fergus, now with the Township of Centre Wellington includes: Soil Excavation, Rock Excavation, Granular Base, Hot Mix Asphalt, Storm Sewer, Watermain, Sanitary Sewer, Traffic Signals, Pedestrian Cross Over, Concrete Curb and Gutter, Concrete Sidewalk, Underground Hydro/Utilities and Street Lighting.
Phase 1 (2024 Construction) work comprises of the reconstruction of St. David Street North (Highway No. 6) from St. Andrew Street to 50m north of Garafraxa Street.
Phase 2 (2025 Construction) work comprises of the reconstruction of St. David Street North (Highway No. 6) from 50m north of Garafraxa Street to Edinburgh Avenue.
2026 Construction work comprises of structure/water valve adjustments, surface asphalt paving and line painting from St. Andrew Street to Edinburgh Avenue.
Contract duration
The estimated contract period will be 10 month(s).
Trade agreements
-
Canadian Free Trade Agreement (CFTA)
Contact information
Contracting organization
- Organization
-
Township Of Centre Wellington
- Address
-
1 MacDonald SquareElora, Ontario, N0B1S0Canada
- Contracting authority
- Sandi Wiles
- Phone
- 111-111-1111
- Email
- swiles@centrewellington.ca
- Address
-
111-111-1111
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.