Upgrade Primary Power Lines - Kouchibouguac National Park of Canada
Solicitation number 5P131-13-0539
Publication date
Closing date and time 2013/10/29 13:30 EDT
Last amendment date
Description
The work includes upgrading 10.0 km of existing single phase, 7200 volt electrical distribution and constructing 1 km of new 1 phase electrical distribution. More specifically, the work includes, but is not limited to the following: 1. Remove existing, deteriorated utility power poles at 40 locations. 2. Provide and install new wooden utility power poles at 60 locations. 3. Provide and install new braced wooden cross-arms on new and existing utility power poles at 200 locations. 4. Provide and install new galvanized anchors at 10 locations. 5. Provide and install new down-guys at 15 locations. 6. Provide and install approximately 11 km of new 2/0 ACSR wire along the primary electrical distribution system. 7. Transfer dead-ends at 10 locations. 8. Transfer existing 1 phase primary and neutral wires to new utility poles at 40 locations. 9. Transfer switchgear as required. 10. Provide all hookups and ensure proper operation of the entire upgraded system.
Contract duration
Refer to the description above for full details.
Trade agreements
-
Agreement on Internal Trade (AIT)
-
North American Free Trade Agreement (NAFTA)
Contact information
Contracting organization
- Organization
-
Parks Canada
- Address
-
30 Victoria StreetGatineau, Quebec, J8X 0B3Canada
- Contracting authority
- Comeau, Daniel
- Phone
- 506-876-1209
- Fax
- 506-876-4802
- Address
-
Kouchibouguac National Park of Canada
186 Route 117Kouchibouguac National Park, NB, E4X 2P1CA
Buying organization(s)
- Organization
-
Parks Canada
- Address
-
30 Victoria StreetGatineau, Quebec, J8X 0B3Canada
Bidding details
Full details regarding this tender opportunity are available in the documents below. Click on the document name to download the file. Contact the contracting officer if you have any questions regarding these documents.
Document title | Amendment no. | Language | Unique downloads | Date added |
---|---|---|---|---|
amendment_1_-_project_5p131-13-0539_qa_en.pdf |
English
|
10 | ||
construction_contract_100k_to_5m_english_power_line_upgrade_2013.pdf | 001 |
English
|
63 | |
amendment_1_-_project_5p131-13-0539_qa_fr.pdf |
French
|
2 | ||
construction_contract_100k_to_5m_french_power_line_upgrade_2013.pdf | 001 |
French
|
12 |
Access the Getting started page for details on how to bid, and more.