    An advanced contract award notice (ACAN) is a public notice indicating to the supplier community that a department or agency intends to award a contract for goods, services or construction to a pre-identified supplier, thereby allowing other suppliers to signal their interest in bidding, by submitting a statement of capabilities. If no supplier submits a statement of capabilities that meets the requirements set out in the ACAN, on or before the closing date and time stated in the ACAN, the contracting officer may then proceed with the award to the pre-identified supplier.

    1. Definition of requirement:
    The Correctional Service Canada has a requirement for an integrated facility, in addition to the current training academy that is located in Kingston, Ontario, to deliver the Correctional Training Program (CTP) in order to hire CSC Correctional Officers / Primary Workers, due to an increased immediate need for Correctional Officers. In order to deliver this 14 week face to face training an integrated facility that includes an infrastructure that will meet all training requirements is required.

    1.1 Objectives:
    Correctional Service Canada (CSC) has a requirement for an integrated facility to deliver training to employees that requires an integrated facility that includes an infrastructure that will meet all training requirements.

    1.2 Scope of Work:
    The Contractor must provide a training facility to support ongoing needs for the CSC Correctional Officer in-person training course, including accommodations, classrooms and firearms storage. The services the Contractor must provide include but are not limited to:

    1. Coordinating bi-monthly meetings with the CSC Project Authority or delegate to ensure the
    deliverables are met and issues are managed in a timely manner.

    2. Establishing committees for food services and accommodations where the Contractor and CSC will be represented.

    3. The Contractor must cover all utility costs associated with the delivery of all services provided. This includes but is not limited to, electricity, water, gas, and lighting.

    4. In case of emergencies must be responsive to changing needs or concerns in relation to
    deliverables within a reasonable timeframe. (e.g., damage due to extreme weather, viral
    outbreaks and pandemic.)

    5. Provide any other services requested by CSC for the successful delivery of the CTP training.

    1.3 Tasks

    1.3.1 The Contractor must:

    1. Provide referenced infrastructure for full use no later than September 1st, 2020.

    2. Provide integrated infrastructure as noted in detail within this Statement of Work that can
    accommodate up to 128 recruits and 25 staff at any given time.

    3. Inform CSC of any planned changes that may affect the CTP curriculum and delivery schedule six weeks in advance. For any unplanned incidents that will affect the CTP curriculum and delivery schedule, the Contractor must inform CSC at the earliest time possible. In both cases, the Contractor must provide a workaround planned with the best available options for CSC’s approval.

    4. With CSC concurrence, assist CSC to identify potential efficiencies that will benefit both the
    Contractor and CSC (e.g., training, space allocation and integration of resources).

    5. Provide required space for the storage of equipment related to CTP delivery as listed in Schedule IV, four months prior to CTP delivery start date, in accordance with the CTP calendar.

    6. Provide access to the training facilities to CSC staff from date of contract award, in order to
    prepare the delivery of the training program.

    7. Provide access to CSC staff to the training infrastructure (including, but not limited to, firearms range, mat room, gym) two months prior to the start of the first CTP.

    8. In cases of emergencies or unforeseen circumstances, if the infrastructure becomes
    inaccessible, the Contractor must provide viable alternative options for space and services that meet CSC’s requirements at any given time as listed in this statement of work.

    9. Provide exterior bilingual signage throughout the training facility for directions to the CSC
    dedicated training building. The Contractor must obtain approval from the CSC Academy
    Manager for all signs.

    10. Provide access to, and use of, the following services and training facilities for each scheduled CTP:

    a) Internet access (WIFI or LAN drops) must be provided by the Contractor for CSC recruits and staff in the CSC training facility.

    b) Parking for CSC recruits and staff, as well as up to seven vehicles linked to the delivery of
    CTP.

    c) Accommodations

    i. Each CTP cohort of up to 32 recruits must be accommodated in semi-private (2
    bedrooms, 1 washroom with shower), private (1 bedroom, 1 washroom with shower)
    hotel type accommodation and/or dorm houses (4 bedrooms, 1 washroom with
    shower) within a 5 minute walking distance of each other. The accommodation
    space must be for CSC recruits only, unless otherwise agreed upon between the
    Contractor and CSC.

    ii. Once CTP recruits are assigned to a room, the recruits will continue to use that
    room for the duration of the training unless relocation is required due to operational
    necessity like maintenance on rooms or operational needs due to pandemic
    situation. If the operation requirements are due to planned operational activities
    (maintenance and repair on rooms), the contractor and must give a three weeks
    notice to CSC.

    iii. Accommodations must include all bed linen, face cloths and towels.

    iv. Accommodations need to be within a 10 minute walking distance to the various
    training facilities (gym, simulation space, classrooms), the location where meals will
    be served and have laundry, parking, internet, a room for boot cleaning and private
    or semi-private washrooms including showers and within a 20 minute walk to the
    firearms range.

    v. The Contractor must provide cleaning services, supplies and equipment including
    vacuum cleaners, garbage removal as and when required. The Contractor must
    provide cleaning Services at a minimum of once per week, including, but not limited,
    to linen change, cleaning of all washrooms, cleaning of common areas. In cases of
    viral outbreaks, the Contractor will need to provide increased cleaning services on
    an as requested basis, based on recommendations from Health Canada and/or
    Provincial Health Authorities as agreed upon between the Contractor and CSC.

    vi. In cases of emergencies the Contractor must be able to house the recruits in an
    area that is reasonably equivalent, were the Contractor must provide meals to the
    recruits.

    vii. In cases of viral outbreaks, the Contractor must provide separate accommodations
    with private washroom for recruits to move to temporarily for isolation from the
    remainder of the CTP cohorts. Chosen isolation space should not be close to the
    living space of the remaining cohort and must be accessible to provide medical
    intervention and food.

    d) Daily meals, including hot breakfast, lunch, dinner and take away evening snack. (See
    example on schedule V.)

    i. For each CTP recruit, while attending scheduled training.

    ii. Meal periods to be arranged to maximize CSC and the Contractor training schedule
    efficiencies.

    iii. Provide box lunches for each CTP recruit for firearms range delivery days.

    iv. Must have capability to provide meals during times of emergency.

    v. In cases of viral outbreaks, the Contractor must provide meals in take-away
    disposable containers and deliver them to recruits that are in isolation from the
    remainder of the CTP cohorts.

    e) Catered Formal Pre-Graduation Dinner

    i. Provide a formal 3 course dinner for each CTP cohort, as well as the trainers. This
    will be approximately one week prior to the graduation date. The date of the dinner
    must be arranged between Contractor and CSC with the CTP planning Schedule.
    No servers for the meal are required as CSC will be responsible for the service.
    Dinner must be between the hours of 18:00hrs and 20:30hrs.

    ii. Provide linens.

    iii. Provide bartender service for alcohol purchase by CSC staff and recruits (if CSC
    decides to allow for this service).

    f) CSC Training Center.

    The Contractor must provide:

    i. Three (3) dedicated classrooms each large enough to accommodate 32 participants
    and 4 trainers. Each classroom must have internet and secure wall structure to hold
    a 90” TV and large white boards.

    ii. Four (4) dedicated storage spaces within the primary training center. These spaces
    must have shelving and be approximately 20’ x 20’ in size. This space must be
    secure and dedicated only to CSC and will be used to store equipment, including
    but not limited to, fire safety equipment, security equipment, and uniforms.

    iii. Dedicated gym space to accommodate groups of 36 individuals at a time, with
    training mats. The training mats must meet the professional standards style of
    Martial Arts mats. The ceiling height needs to be above 10ft. and accommodate
    personal space of 4’ x 4’ for each of the 36 individuals.

    iv. Dedicated office space for CSC coordinators and trainers.

    a. Trainer Office Space and storage space must be available to accommodate
    22 trainer desks, a boardroom space large enough to accommodate 26
    staff, and a binder storage area (Appx. 20’ X 20’).

    b. Administrative space is required for two administrators and two managers,
    that must include storage, internet access and the ability to secure the
    offices.

    v. Two dedicated simulation spaces are required to mirror an institutional setting for
    medium security and maximum security ranges with cells. The simulation spaces
    need to be separate from each other and be able to accommodate training space
    for 32 participants in each as per Schedule I. Audio and visual capabilities are
    required for each space that cannot be seen from the viewing gallery. (e.g., inside
    each cell). The simulation space must be no smaller than the Training facility floor
    plan as per Schedule I.

    vi. Dedicated cleaning services for the CSC Training Center five days a week. The
    Contractor must ensure the cleaning practices used reduce the risk of spreading
    infectious diseases. In cases of viral outbreaks, the Contractor must provide
    increased cleaning services based on Health Canada and/or Provincial Health
    recommendations, in agreement between the Contractor and CSC.

    g) Firearms vault

    i. Dedicated space for CSC firearms based on the number of firearms as identified in
    Schedule IV and must be within a 10-minute drive or less to the primary training
    center.

    ii. The space must have humidity control.

    iii. The space must meet the provincial and national regulations for firearms storage.

    iv.Dedicated space for 32 recruits and 4 trainers for the cleaning of firearms in the
    vicinity of the firearms vault that includes tables.

    h) Ammunition vault

    i. A separate dedicated space for CSC ammunition based on the amount of
    ammunition as identified in Schedule IV that must be within 10-minute drive or less
    to the primary training center.

    ii. The space must meet the provincial and national regulations for ammunitions
    storage.

    i) Firearms 16 Lane, 100m Training Range

    i. Must be the primary range for CSC firearms training and to be within 20 minute
    walk or less to the primary training center.

    ii. Each lane must be at minimum 1.5m wide.

    iii. CSC will book the training Range through the Contractor’s scheduling staff.

    iv. Range can be indoor or outdoor but must be a minimum of 50 meters and allow
    CSC firearms caliber (5.56mm carbine, 12 gauge shotgun, 9mm pistol) and must
    allow for a ground shot with the 12 gauge (#4 buck shot).

    v. The Contractor must provide grass cutting, snow and ice removal prior to 08:00 on
    range days identified in the schedule and include areas on the range from
    platforms to targets, including platforms, walking paths, parking areas and
    classroom entrance areas.

    vi. If an outdoor range is provided, it must have a shooting platform that is covered
    and off the ground, be a minimum of 4 feet and 11 inch wide by 4 feet and 4 inch
    off the ground and be able to accommodate shooting positions including standing
    barricade, prone and kneeling.

    vii. The Contractor must decontaminate the range as per federal government
    regulations.

    viii. The Contractor must manage the recycling of used brass casings.

    ix. The Contractor must provide a storage area specific for equipment CTP Firearms
    training, located at firearm range. The storage area must be large enough to store
    training equipment including but not limited to shooting targets, wooden target
    boards, hearing protection, staple guns, staples, and not including Firearms or
    Ammunition.

    j) Firearms Range Classroom

    i. The Contractor must provide a firearms range classroom that meets CSC firearms
    training requirements and includes sufficient space for 35 persons, parking in the
    vicinity and washrooms.

    k) A dedicated space for Indoor Firearms range

    i. The Contractor must provide an indoor firearms range that meets CSC’s
    approximately one day 40mm Launcher training per CTP.

    ii. The Contractor must provide access to this range to CSC on an as requested basis.

    iii. CSC will book the indoor firearms range through the Contractor’s scheduling staff.

    l) A dedicated space for Fire Safety Training

    i. Must include a Fire-pan and hydrant at Fire Training Compound.

    ii. The Contractor must provide an area for fire safety training that meets the
    requirements of CSC’s Fire Safety Training, within the hours of operation of the
    Contractor.

    iii. CSC will book the fire safety training area through the Contractor’s scheduling staff.

    m) Fitness Gym

    i. The contractor must provide a fitness gym that meets the requirements of CSC’s
    Fitness Program, within the hours of 0600 hours to 2100 hours, seven days a week
    and includes both cardio and weight equipment.

    ii. The fitness gym must meet the requirements of CSC’s Baton and Chemical Agent
    Program.

    iii. CSC will book the fitness gym through the Contractor’s scheduling staff.ii. iii. n) Parade and graduation space

    n) Parade and graduation space

    i. Must provide an indoor dedicated space for Parade and Graduation ceremony. Space
    must be indoors, must accommodate up to 130 people for Graduation, and must allow space
    for cohorts of 32 (4 persons wide by 8 rows).

    o) Marching and Parade (outdoors)

    i. Provide an outdoor space for cohorts of 32 (4 persons wide by 8 rows) to March to and
    from various training spaces, accommodations, meal areas, graduation parade or other
    areas outside the primary training facility.

    1.4 Expected results:
    As part of Correctional Officer selection process to provide a training facility and access to services to support ongoing needs of the CSC’s Correctional Officer recruits, 14 week in person training course, Including accommodations, classrooms and firearms storage.

    1.5 Performance standards:
    The Contractor must provide an integrated facility that includes an infrastructure that will meet all training requirements as described in Tasks and Deliverables, including but not limited to
    accommodations, classrooms and firearms storage. Thefacility must meet the requirements of CSC’s National Training Standards found in the CTP Planning document, Firearms Safety Protocol, as well as Commissioner’s Directive 567-5 Use of Firearms (2018-12-10).

    1.6 Deliverables:
    1.6.1 The Contractor must provide the following:
    1. Referenced infrastructure for full use.
    2. Integrated infrastructure as noted in detail within this agreement that can accommodate up to 128
    recruits and 25 staff at any given time.
    3. Inform CSC of any planned changes that may affect the CTP curriculum and delivery schedule
    six weeks in advance.
    4. Identify potential efficiencies that will benefit both organizations (i.e. training, space allocation and
    integration of resources).
    5. Required space for the storage of equipment.
    6. Access to the training facilities to CSC staff from date of contract award.
    7. Access to CSC staff to the training infrastructure.
    8. If the infrastructure is not fully accessible, viable alternative options for space and services at any
    given time.
    9. Exterior bilingual signage throughout the training facility.
    10. Internet access (WIFI or LAN drops) for CSC recruits and staff in the CSC training facility.
    11. Parking for CSC recruits and staff, as well as up to seven vehicles linked to the delivery of CTP.
    12. Accommodations
    13. Daily meals, including hot breakfast, lunch, dinner
    14. Cater Formal Pre-Graduation Dinner
    15. CSC Training Center
    16. Firearms vault
    17. Ammunition vault
    18. Firearms 16 Lane, 100m Training Range
    19. Firearms Range Classroom
    20. A dedicated space for Indoor Firearms range
    21. A dedicated space for Fire Safety Training
    22. Fitness Gym
    23. Parade and graduation space
    24. Marching and Parade ( outdoors) space

    1.6.2 Paper consumption:
    a. Should printed material be required, double-sided printing in black and white format is the
    default unless otherwise specified by the Project Authority.
    b. The Contractor must ensure printed material is on paper with a minimum recycled content of
    30% and/or certified as originating from a sustainably managed forest.
    c. The Contractor must recycle unneeded printed documents (in accordance with Security
    Requirements).

    1.7.1 Constraints
    The Contractor must immediately report to the Project Authority, by telephone with a follow up by electronic mail, any urgent issue that arises during the course of the work that could impact on itsprogress, implementation or operation.

    1.7.2 Location of work:
    a. The Contractor must perform the work at the contractor's place of business.
    Summerside, PEI

    b. Travel

    No travel is anticipated for performance of the work under this contract.

    1.7.3 Language of Work:
    The contractor must perform all work in English.

    1.7.4 Security Requirements:

    This contract includes the following security requirements:
    1. The Contractor/Offeror must,at all times during the performance of the Contract/Standing
    Offer, hold a valid Designated Organization Screening (DOS), issued by the Contract
    Security Program (CSP), Public Works and Government Services Canada (PWGSC).
    2. The Contractor/Offeror personnel requiring access to sensitive site(s) must EACH hold a
    valid RELIABILITY STATUS, granted or approved by the CSP, PWGSC. Until the security
    screening of the Contractor personnel required by this Contract has been completed
    satisfactorily by the CSP, PWGSC, the Contractor personnel MAY NOT ENTER sites
    without an escort.
    3. Subcontracts which contain security requirements are NOT to be awarded without the prior
    written permission of the CSP, PWGSC.
    4. The Contractor/Offeror must comply with the provisions of the:
    a)Security Requirements Check List and security guide (if applicable), attached at Annex
    ‘’C’’ in the resulting contract;
    b) Industrial Security Manual (Latest Edition).

    2. Criteria for assessing the statement of capabilities (minimum essential requirements):
    Any interested supplier must demonstrate by way of a statement of capabilities that it meets the following requirements:

    Accommodations: must provide accommodations for for 96 recruits at any given time in a fiscal year, and must be able to accommodate cohorts of 32 in close vicinity to each other.
    Accommodations must have access to laundry, parking, internet, a room for boot cleaning and
    private or semi-private washrooms. Rooms must mirror a three start hotel standards.

    Meals: must meet the specific dietary standards as per the Canada food guide and must
    accomodate religious and medical diets. Meals must be served three times daily, seven days a
    week to 96 participants within 90-minute timeframe for each meal. At some point in the training
    schedule, the Contractor must provide box lunches and must deliver hot food to the firearms
    range as requested by CSC.

     Firearms Range: must be 100 or 50 meters in length, have 16 live shooing lanes, a range
    classroom that can accommodate 32 participants, storage on site (approximately the size of a
    40ft shipping container, also know as a C-Can), parking, washroom facilities, be within no more
    than a 10 minute drive from the primary training centre. The classroom at the range must be
    located at a safe distance in the perimeter. The firearms range and classroom must be accessible and maintained 12 months of the year.

    Firearms vault and ammunition vault: Must comply with safety standards and be large enough to store approximately 800,000 rounds of ammunition and approximately 180 firearms.

    Three Classrooms: Each classroom must be large enough to accommodate 32 participants and four trainers, have internet and have secure wall structure to hold 90’ TV and large white boards. Must be in the primary training building.

    Two simulation spaces: must mirror an institutional setting for medium security and maximum
    security. The simulation spaces must be separate from each other and be able to accommodate training space for 32 participants in each. Each stimulation space must include audio and visual capabilities. Must be in the primary training building.

    Four (4) storage spaces: must be located within the primary training building. These spaces
    must have shelving and be approximately 20’ X 20’ in size. These spaces must be secure and
    dedicated only to CSC.

    Correctional Trainer Office space and storage space: Must be able to accommodate 22 desks for trainers , a boardroom space, and a binder storage area. Must be in the primary training building.

    Administrative Space: Must include office space for two (2) administrative staff and one
    manager, storage, internet and ability to secure offices. Must be located in the same building as the classroom space.

    Weight and Cardo fitness area: must be available for extended hours and within walking
    distance to the primary training facility and accommodations. The fitness area must be large
    enough to accommodate 32 people and have shower facilities and washrooms.

    Dedicated gym space: Must be large enough to accommodate a group of 36 individuals at a
    time, with grapplingmats with a minimum 1.5-inch thickness. The ceiling height needs to be at
    least 10ft and accommodate matted floor personal space of at least 4’ X 4’ for each of the 36
    individuals.

    Fire Safety training Facility: Must have a fire pan, hydrant and fire safety-training compound.

    3. Applicability of the trade agreement (s) to the procurement

    This procurement is subject to the following trade agreement (s):

    Canada – Chile Free Trade Agreement (CCFTA);
    Canadian Free Trade Agreement (CFTA);
    World Trade Organisation-Agreement on Government Procurement (WTO-AGP).
    The procedural requirements of the other international trade agreements will be fulfilled following compliance to the procedural requirements of CCFTA , CFTA, WTO-AGP and/or the CETA.

    4. Set-aside under the Procurement Strategy for Aboriginal Business
    This procurement is not subject to any set-asides for Aboriginal Suppliers.

    5. Comprehensive Land Claims Agreement (s)
    This procurement is not subject to a Comprehensive Land Claims Agreement.

    6. Justification for the Pre-Identified Supplier
    The pre-identified supplier is able to provide an integrated facility and the required services that meet all of the minimum essential requirements described in this ACAN.
    Holland College is a registered Canadian College that meets all of CSC's requirements for the delivery of the 14 week face-to-face, in person Correctional Training program CTP, including, but not limited to: accommodations, meals, firearm rage, firearms vault and ammunition vault, three classroom space, two simulation space, four storage space, a correctional officer trainer office space, administration space, weight and cardio fitness area, a dedicated gym space and fire safety training space. Correctional Service of Canada has a requirement to deliver the Correctional Training program (CTP) in order to hire CSC Correctional Officers/Primary Workers.

    7. Government Contracts Regulations Exception(s)
    The following exception to the Government Contracts Regulations is invoked for this procurement under subsection:

    (d) only one person is capable of performing the contract.

    8. Exclusions and/or Limited Tendering Reasons
    The following exclusion (s) and/or limited tendering reasons are invoked under the section of the trade agreement (s) specified:

    Canada Chile free trade agreement (CCFTA, Article Kbis-09
    b. where, for works of art, or for reasons connected with the protection of patents, copyrights or other exclusive rights, or proprietary information or where there is an absence of competition for technical reasons, the goods or services can be supplied only by a particular supplier and no reasonable alternative or substitute exists.

    Canadian Free Trade Agreement (CFTA), Article 513
    (b) if the goods or services can be supplied only by a particular supplier and no reasonable alternative or substitute goods or services exist for any of the following reasons:
    (i) the requirement is for a work of art;
    (ii) the protection of patents, copyrights, or other exclusive rights;
    (iii) due to an absence of competition for technical reasons;
    (iv) the supply of goods or services is controlled by a supplier that is a statutory monopoly;
    (v) to ensure compatibility with existing goods, or to maintain specialized goods that must be maintained
    by the manufacturer of those goods or its representative;
    (vi) work is to be performed on property by a contractor according to provisions of a warranty or
    guarantee held in respect of the property or the original work;
    (vii) work is to be performed on a leased building or related property, or portions thereof, that may be performed only by the lessor; or
    (viii) the procurement is for subscriptions to newspapers, magazines, or other periodicals;

    World Trade Organisation-Agreement on Government Procurement (WTO-AGP) - Article XV:
    (b) when, for works of art or for reasons connected with protection of exclusive rights, such as patents
    or copyrights, or in the absence of competition for technical reasons, the products or services can be
    supplied only by a particular supplier and no reasonable alternative or substitute exists;

    9. Ownership of Intellectual Property
    There are no intellectual property terms in the contract.

    10. Period of the proposed contract or the delivery date(s)
    The proposed contract is for a period of 7 months, from September 01/2020 to March 31/2021, with an option to extend the contract for four (4) additional one-year periods.

    11. Cost estimate of the proposed contract
    The estimated value of the contract, including option(s), is $13,369,342.39 (GST/HST extra).

    12. Name and address of the pre-identified supplier
    Name: Holland College
    Address: 140 Weymouth Street
    Charlottown, PE C1A 4ZH13.

    Suppliers' right to submit a statement of capabilities
    Suppliers who consider themselves fully qualified and available to provide the goods, services or construction services described in the ACAN, may submit a statement of capabilities in writing to the contact person identified in this notice on or before the closing date and time of this notice. The statement of capabilities must clearly demonstrate how the supplier meets the advertised requirements.

    14. Closing date and time for a submission of a statement of capabilities
    The closing date and time for accepting statements of capabilities is August 14th, 2020 at 2:00 PM EST.

    15. Inquiries and submission of statement of capabilities

    Inquiries and statement of capabilities are to be directed to:

    Name: Nadine Pike
    Title: Senior Procurement Officer
    Correctional Service Canada
    Branch/Directorate
    : Contracting Operations, NHQ
    Telephone: (506) 378-1049
    E-mail address: nadine.pike@csc-scc.gc.ca

    Contract duration

    Refer to the description above for full details.

    Trade agreements

    • World Trade Organization Agreement on Government Procurement (WTO GPA)
    • Canadian Free Trade Agreement (CFTA)
    • Canada-Chile Free Trade Agreement (CCFTA)

    Partner with another business

    The functionality to add your company name to the list of interested businesses is temporarily unavailable.

    This list does not replace or affect the tendering procedures for this procurement process. Businesses are still required to respond to bid solicitations, and to compete based on the set criteria. For more information please read the Terms of use.

    Contact information

    Contracting organization

    Organization
    Correctional Service of Canada
    Address
    340 Laurier Ave W
    Ottawa, Ontario, K1P0P9
    Canada
    Contracting authority
    Pike, Nadine
    Phone
    506-378-1049
    Email
    nadine.pike@csc-scc.gc.ca

    Buying organization(s)

    Organization
    Correctional Service of Canada
    Address
    340 Laurier Ave W
    Ottawa, Ontario, K1P0P9
    Canada
    Bidding details

    Full details regarding this tender opportunity are available in the documents below. Click on the document name to download the file. Contact the contracting officer if you have any questions regarding these documents.

    Tender documents
    Document title Amendment no. Language Unique downloads Date added
    French
    13
    English
    35

    Access the Getting started page for details on how to bid, and more.

    Eligibility and terms and conditions

    Government of Canada tender and awards notices, solicitation documents, and other attachments are fully accessible and available free of charge and without having to register on CanadaBuys.

    Information may be available on another source prior to being available on CanadaBuys. You may have received this information through a third-party distributor. The Government of Canada is not responsible for any tender notices and/or related documents and attachments not accessed directly from CanadaBuys.canada.ca.

    Government of Canada tender or award notices carry an OpenGovernment License - Canada that governs its use. Related solicitation documents and/or tender attachments are copyright protected. Please refer to our terms and conditions page for more information.

    Summary information

    Support for small and medium businesses

    If you have questions about this tender opportunity, please contact the contracting officer, whose information is found in the Contact information tab. 

    Refer to our Support page if you need help or have questions about the government procurement process, including how to bid or how to register in SAP Ariba. You can also contact Procurement Assistance Canada, which has offices across Canada.

     

    Date modified: