Installation of a heating and cooling solar plant
Solicitation number 23332-160385/A
Publication date
Closing date and time 2015/10/01 14:00 EDT
Last amendment date
Description
Trade Agreement: Agreement on Internal Trade (AIT) Tendering Procedures: Generally only one firm has been invited to bid Non-Competitive Procurement Strategy: Interchangeable Parts Comprehensive Land Claim Agreement: No Vendor Name and Address: Beaudin Le Prohon inc. 6171 BOUL. BOURQUE ROCK FOREST Quebec Canada J1N1H2 Nature of Requirements: Installation of a heating and cooling solar plant 1. Advance Contract Award Notice (ACAN) An ACAN is a public notice indicating to the supplier community that a department or agency intends to award a contract for goods, services or construction to a pre-identified supplier, thereby allowing other suppliers to signal their interest in bidding, by submitting a statement of capabilities. If no supplier submits a statement of capabilities that meets the requirements set out in the ACAN, on or before the closing date stated in the ACAN, the contracting officer may then proceed with the award to the pre-identified supplier. 2. Requirements definition Natural Resources Canada's CanmetENERGY is the Canadian leader in clean energy research and technology development. The CanmetENERGY Varennes Research Centre leads programs in buildings and communities, renewables, industrial processes and manages the world-leading RETScreen International Clean Energy Decision Support Centre. We design and implement clean energy solutions, and build on knowledge that helps produce and use energy in ways that are more efficient and sustainable. Natural Resources Canada has a requirement for the supply and installation, on the roof of the CanmetENERGY Varennes Research Centre, of a solar-powered heating and cooling system that shall integrate ejector-cooling technology developed by CanmetENERGY. This turnkey project shall include all of the steps in successfully carrying out the project (engineering, manufacturing, supplying, installing and commissioning). Scope of work a) Install, on the rooftop, a series of solar parabolic troughs - System features: • Nominal capacity: 60 kW • Minimum temperature at the collector outputs: 110 degrees Celsius • Annual output of collectors = 45% min. • Equipment and materials to be new and CSA and/or SRCC certified • Rooftop installation • Overall dimensions = 400 m2 on the roof - The Contractor shall perform the structural analysis work as well as the preparatory work on the roof (install anchoring, structural reinforcement) that is necessary for the installation of the solar collectors. b) Install a heating system that includes the following: - A pumping module • A heat exchanger for the building's heating system • Flanges in place to accommodate the ejector cooling system's heat exchanger • A recovery tank - Heat transfer medium - All piping needed to connect all the equipment - The necessary measuring equipment for analyzing the system's energy performance - Maximum overall dimensions of 1.9 m × 3.5 m × 1.9 m (width × length × height) c) Install a 16-kW ejector cooling system - The Contractor shall integrate the CanmetENERGY-designed ejector cooling technology into the system (with no IP transfer) - The piping and instrumentation diagram (P&ID), the ejector shop drawings and the specifications will be provided following contract award. The Contractor will be required to sign a non-disclosure agreement. - Maximum overall dimensions of 1.9 m × 3.5 m × 1.9 m (width × length × height) d) Install, on the rooftop, an air condenser (of sufficient capacity to vent the excess heat from the system at all times) - The Contractor shall perform the structural analysis work as well as the preparatory work on the roof (install anchoring, structural reinforcement) that is necessary for the installation of the solar collectors. e) Integrate the various system components - Make the mechanical and electrical connections - Installation of the control system and implementation of the operation strategy of the heating and cooling system - For the ejector-cooling system, use Delta Controls products that are compatible with the building's system f) Integrate the system into the building's existing cooling and heating primary systems - Make the mechanical and electrical connections - Integrate into first-stage heating and cooling to reap the maximum benefits of the solar-powered system. - Integration shall not compromise the heating and cooling systems or employee comfort. No reduction in the primary system's capacity is foreseen. Isolation of the solar-powered system must be possible in the event of a technical problem. - Connect to the building's existing control system and adjust the sequences of operation. Use control devices that are compatible with the existing system. - Implement the new heating and cooling system operation strategy for the building. Operate in first-stage heating and cooling to reap the maximum benefits of the solar-powered system. Further, when sunlight levels are low, the building's main heating and cooling system shall bear the full load. 3. Criteria for assessment of the Statement of Capabilities (Minimum Essential Requirements) Any interested supplier must demonstrate by way of a statement of capabilities that its system meets the following requirements: a) Shall have manufactured and installed a solar-powered ejector heating and cooling system with a capacity of 50 kW of heating and 15 kW of cooling. b) Shall be capable of supplying and installing a solar-powered heating collector system that meets the following technical specifications: - Nominal capacity: 60 kW - Minimum temperature at the collector outputs: 110 degrees Celsius - Annual output of collectors = 50% min. - Rooftop installation - CSA and/or SRCC certified - Overall dimensions = 400 m2 on the roof - Maximum overall dimensions of the pumping and ejector cooling modules: overall dimensions of 1.9 m × 3.5 m × 1.9 m (width × length × height): Overall dimensions: 3.5 m × 4 m × 2.5 m By device: 1.9 m × 3.5 m × 1.9 m c) Ability to complete the project within 8 months after Contract award, i.e. the start of the 2016 summer season. 4. Applicability of the trade agreement(s) to the procurement This procurement is subject to the following trade agreement(s): Agreement on Internal Trade (AIT) 5. Set-aside under the Procurement Strategy for Aboriginal Business N/A 6. Comprehensive Land Claims Agreement(s) N/A 7. Justification for the Pre-Identified Supplier We intend to deal directly with the supplier mentioned in section 13 below as, to our knowledge, it is the only supplier that meets the mandatory criteria set out in section 3 above. Rackam - Le Prohon has already manufactured and installed a solar-powered ejector heating and cooling system with a capacity of 50 kW of heating and 15 kW of cooling. Rackam - Le Prohon is in the process of supplying and installing a system that meet the technical specifications set out in section 3 above. Rackam - Le Prohon has the necessary expertise to complete the project within the time frame set out in the contract. Rackam - Le Prohon proposes a solar-powered ejector heating and cooling system that is compatible with the ejector-cooling technology developed by CanmetENERGY. Should Canada receive a statement of capabilities from a supplier that contains sufficient information to indicate that it meets the requirements set forth in this ACAN, a competitive process will be triggered with a financial evaluation methodology that shall take into account the cost of labour required by CanmetENERGY to adapt the design of the ejector cooling systems proposed by potential bidders. 8. Government Contracts Regulations Exception(s) The following exception(s) to the Government Contracts Regulations is (are) invoked for this procurement under subsection 6(d) - "only one person is capable of performing the work". 9. Exclusions and/or Limited Tendering Reasons The following exclusion(s) and/or limited tendering reasons are invoked under the: Agreement on Internal Trade (AIT) - Article 506 12 (b) 10. Ownership of Intellectual Property N/A 11. Period of the proposed contract or delivery date The system must be delivered and installed within 8 months after Contract award. 12. Cost estimate of the proposed contract The estimated value of the contract is in the following price range : $250,000.00 to $1,000,000.00 (GST/HST extra). 13. Name and address of the pre-identified supplier Rackam - Le Prohon 301-85 rue Albert Sherbrooke, Québec J1H 1N1 Canada 14. Suppliers' right to submit a statement of capabilities Suppliers who consider themselves fully qualified and available to provide the goods, services or construction services described in the ACAN may submit a statement of capabilities in writing to the contact person identified in this notice on or before the closing date of this notice. The statement of capabilities must clearly demonstrate how the supplier meets the advertised requirements. 15. Closing date for a submission of a statement of capabilities The closing date and time for accepting statements of capabilities is October 1st, 2015, at 2:00 p.m. EST). 16. Inquiries and submission of statements of capabilities Inquiries and statements of capabilities are to be directed to: Gabriel Piras Direction des approvisionnements | Supply Directorate Travaux publics & Services gouvernementaux Canada | Public Works & Government Services Canada 601-1550, avenue D'Estimauville, Québec, (Québec) G1J 0C7 Courriel | Email: Gabriel.Piras@tpsgc-pwgsc.gc.ca Téléphone | Telephone: 418-649-2870 Télécopieur | Facsimile: 418-648-2209 Delivery Date: Above-mentioned You are hereby notified that the government intends to negotiate with one firm only as identified above. Should you have any questions concerning this requirement, contact the contracting officer identified above. An Advance Contract Award Notice (ACAN) allows departments and agencies to post a notice, for no less than fifteen (15) calendar days, indicating to the supplier community that it intends to award a good, service or construction contract to a pre-identified contractor. If no other supplier submits, on or before the closing date, a Statement of Capabilities that meets the requirements set out in the ACAN, the contracting authority may then proceed with the award. However, should a Statement of Capabilities be found to meet the requirements set out in the ACAN, then the contracting authority will proceed to a full tendering process. Suppliers who consider themselves fully qualified and available to provide the services/goods described herein, may submit a statement of capabilities in writing to the contact person identified in this Notice on or before the closing date of this Notice. The statement of capabilities must clearly demonstrate how the supplier meets the advertised requirements. The PWGSC file number, the contracting officer's name and the closing date of the ACAN must appear on the outside of the envelope in block letters or, in the case of a facsimile transmission, on the covering page. The Crown retains the right to negotiate with suppliers on any procurement. Documents may be submitted in either official language of Canada.
Contract duration
Refer to the description above for full details.
Trade agreements
-
Agreement on Internal Trade (AIT)
Reason for limited tendering
A contracting officer can use limited tendering for specific reasons outlined in the applicable trade agreements. The reason for this contract is described below:
-
Additional Deliveries
Contact information
Contracting organization
- Organization
-
Public Works and Government Services Canada
- Address
-
11 Laurier St, Phase III, Place du PortageGatineau, Quebec, K1A 0S5Canada
- Contracting authority
- Piras, Gabriel
- Phone
- (418) 649-2870 ( )
- Fax
- (418) 648-2209
- Address
-
601-1550, Avenue d'Estimauville
QuébecQuébec, Québec, G1J 0C7
Buying organization(s)
- Organization
-
Natural Resources Canada
- Address
-
580 Booth StOttawa, Ontario, K1A 0E4Canada
Bidding details
Details for this tender opportunity are provided in the Description tab.
Please contact the contracting officer to get the full solicitation documentation, access information on how to bid, or if you have any questions regarding this tender opportunity.
Note that there may be fees to access the documents or bid. These should be outlined in the Description tab.
We recommend that you contact the contracting officer as soon as possible, as there may be deadlines for receiving questions.