Consulting Services for Revitalization Storm Culvert
Numéro de sollicitation 1220-2022-2791
Date de publication
Date et heure de clôture 2022/09/06 17:00 HAE
Description
Proposals and enquiries must be submitted through Bonfire.
All documents for this opportunity can be found on Bonfire at the following link:
https://abbotsford.bonfirehub.ca/opportunities/55929
The City is requesting engineering services for storm culvert revitalization at three rural locations. All three culverts are in poor condition; meaning collapse could be likely in the near future across these rural collector roads and are therefore recommended for replacement or rehabilitation, as follows:
Professional services are required to complete an evaluation of different options for revitalization of 3 storm culverts (location Maps are shown in Attachment A) and to make recommendations for the highest rated option(s) to advance to design and construction. Site access, environmental impact, depth of bury, pipe condition and surrounding infrastructure will be used to determine if a trenchless technology (such as CIPP Lining, slip lining, or pipe bursting, augering) is suitable and feasible compared to a open cut solution.
The Project will generally include:
All documents for this opportunity can be found on Bonfire at the following link:
https://abbotsford.bonfirehub.ca/opportunities/55929
The City is requesting engineering services for storm culvert revitalization at three rural locations. All three culverts are in poor condition; meaning collapse could be likely in the near future across these rural collector roads and are therefore recommended for replacement or rehabilitation, as follows:
Location | Culvert ID Number | Location | Diameter / type | Length |
1 | 115328 | 31500 Downes Road | 450mm / Concrete | 32.0m |
2 | 114410 | 28345 King Road | 750mm / CSP | 18.3m |
3 | 114945 | 3526 Lefeuvre Road | 800mm / CSP | 17.3m |
Professional services are required to complete an evaluation of different options for revitalization of 3 storm culverts (location Maps are shown in Attachment A) and to make recommendations for the highest rated option(s) to advance to design and construction. Site access, environmental impact, depth of bury, pipe condition and surrounding infrastructure will be used to determine if a trenchless technology (such as CIPP Lining, slip lining, or pipe bursting, augering) is suitable and feasible compared to a open cut solution.
The Project will generally include:
- Investigations and Studies (which could include environmental and geotechnical investigations);
- Survey;
- Preliminary and detail design services, which could include both open cut and trenchless methodologies;
- Temporary working and / or permanent easement assessments;
- Contract Administration services(optional);
- Construction services (optional); and
- Post Construction services (optional).
Durée du contrat
Voir la description ci-dessus pour voir tous les détails.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
City of Abbotsford
- Autorité contractante
- Alice Lau
- Adresse courriel
- alau@abbotsford.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.