Rushbrook Harbour Mooring Pile Repair
Status Awarded
Solicitation number 30003420
Publication date
Contract award date
Status Awarded
Solicitation number 30003420
Publication date
Contract award date
This contract was awarded to:
TWO PHASE SELECTION PROCESS
This is the first phase (Phase 1) of a two-phase competition: the first phase will evaluate the qualifications of all bidders; second phase (Phase 2) will invite the qualified bidders to provide a financial bid on the project based on the specifications and drawings. Upon award of contract in Phase Two the pre-qualification list will be terminated, no additional contracts will be awarded.
The work consists of mooring pile replacement, pile blocking replacement, and gangway replacement at Rushbrook Small Craft Harbour, Prince Rupert, BC, in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the contract.
In general, work under this contract will consist of, but will not necessarily be limited to, the following:
Mandatory Work:
Optional Work:
Site Familiarization
Before submitting a bid, it is recommended but not mandatory that bidders visit the site and its surroundings to review and verify the form, nature and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid or costs to do the work. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply.
The Contractor must perform and complete the Work by February 17, 2023.
Refer to the description above for full details.